Project Details
Carpark Line marking, Fixture installation, Signage installation
Fairfield hospital engaged us to complete the line marking and safety fixture install to the new car park they built in 2026. As part of the project we set out the new line marking as per the plan and installed all of the required bollards, wheel stops and signage.
All of the line marking was done in preform thermoplastic. The project was completed over 2 days shifts and the carpark was able to open on time and provide additional parking to the hospital and its staff.